Jordan and Salt Lake Canal Bridge and Access Ramp at Walker Lane

Engineering design services were completed for the canal bridge and access ramp up to Big Cottonwood Creek. The bridge was constructed in the winter of 2018, but the ramp construction was postponed until after runoff was completed later the following year.

Location: Cottonwood Heights, Utah