Juniper Canyon Debris Basin 3
RB&G designed and provided construction engineering services for this new debris basin within the Rosecrest development in southwestern Salt Lake County, Utah. RB&G also designed the modifications to an existing retention structure. The debris basin, classified as a high hazard structure by the State of Utah, has a structural height of 40 feet. The embankment dam was constructed in 2019, and the project was completed during the spring of 2020.
Services: Geotechnical design, geotechnical investigations, construction engineering services, materials testing
Location: Rosecrest Development, Salt Lake County, Utah