Mill Meadow Dam Rehabilitation

RB&G Engineering and Alpha Engineering are currently working as a team during the Mill Meadow Dam Rehabilitation project. The project includes construction of a new spillway designed to route the spillway evaluation flood, which has a peak reservoir inflow of 16,792 cfs, through the reservoir without overtopping the dam. The project also includes a new toe drain to decrease the potential for piping, and a new channel to route spillway flows to the natural channel of the Fremont River.

Services:  Geotechnical design, construction engineering services, materials testing

Location: Sevier County, Utah