Orem 1600 North, State Street to 275 West

The project consisted of reconstructing and widening a multi-lane intersection. The work involved reconfiguring, upgrading, and replacing the signal, heads, poles, and street lights. Relocation items included utility, storm drainage, gravity irrigation pipe, diversion boxes, sidewalks, and ADA pedestrian ramps.

Services:  Assisted City in Design and Preparation of the PS&E Package, Right-of-Way, Utility Coordination, Protection and Relocation

Location: Orem, Utah