American Fork City 900 West; State Street (US 89) to 1120 North
The reconstruction project drastically improved the main transportation corridor of American Fork City and included roadway widening from 2 to 5 lanes through rural residential/commercial developing areas, new asphalt pavement, storm drain facilities, decorative street lighting, utility coordination, curb/gutter, sidewalk, 2-traffic signals, and a 7-lane intersection with State Street.
Services: civil design, construction engineering management, transportation, culinary water, storm drainage, survey, public involvement, permits, right-of-way documents, utility protection and relocation, drainage, pavement, roadway and SWPPP design, coordination with irrigation and utility companies, signal design, UPRR and UTA railroad and UDOT coordination for interface, and PS&E.
Location: American Fork City, Utah