American Fork City 900 West, State Street (US 89) to 1120 North

This project to drastically improve the main transportation corridor of American Fork City included 4500 feet of roadway widening from 2 to 5 lanes through rural residential/commercial developing areas, new asphalt pavement, storm drain facilities, decorative street lighting, utility coordination, curb and gutter, sidewalk, 2-traffic signals, and a 7-lane intersection with State Street.

Services: civil design, construction engineering management, transportation, culinary water, storm drainage, survey, public involvement, permits, ROW documents, utility protection and relocation, drainage, pavement, roadway and SWPPP design, coordination with irrigation and utility companies, signal design, railroad and UDOT coordination for interface, and PS&E.

Location: American Fork City, Utah