Orem 1600 North, State Street to 275 West

The project tasks incorporated reconfiguration of the intersection, widening the intersection layout, and upgrading traffic signals from State Street to 275 West. Work involved reconfiguring, upgrading, replacing signal; including heads, pedestrian heads, poles/mast arms, street lights, and detection. Other elements included relocating the utility, storm drainage, gravity irrigation pipe, diversion boxes, sidewalk, and ADA pedestrian ramps.

Services: Assisting the City with the design and preparation of complete UDOT PS&E package, including right-of-way, utility coordination/protection and relocation, signal design, roadway, curb and gutter, drainage and irrigation design, sidewalk and ADA ramp design, State-Furnished Material Coordination, and construction engineering management (CEM).

Location: Orem, Utah