Cabelas Boulevard, Triumph Boulevard to 4250 North
The goal of Lehi City was to investigate alternatives to conventional complete pavement section reconstruction which would include removing and replacing 12 inches of fill below the original base gravel layer. RB&G Engineering provided preconstruction engineering, construction document preparation, and supplemental intermittent construction phase services.
Services: design work including utility identification, drainage treatments, preparation of advertising plans, specifications, and engineer’s opinion of project cost
Location: Lehi, Utah