Lehi 1200 West, 2100 North to Timpanogos Highway

Lehi City reconstructed and widened this roadway to five lanes between I-15 and SR-92. RB&G designed the project and performed construction engineering management. The project included 6590 ft of roadway widening, 2 to 5 lanes through residential/commercial developing areas, storm drainage, 8- to 12-inch sewer, 6- to 20-inch culinary water and 12- to 30-inch pressurized irrigation main lines, extensions/stub, decorative street lighting, utility protections/relocations and betterments, curb/gutter, sidewalk/10-ft trail, MSE retaining wall, 4-traffic signals, and interface 5-lane intersections with SR-92 and with the new I-15 interchange.

Services: construction engineering management including survey, permits, public involvement, ROW documents, utility design and coordination with irrigation and utility companies for protection, relocation, and betterments, waterline and sewer design, roadway and storm drainage design, geotechnical and pavement design, SWPPP design, signal design, railroad and UDOT coordination for interfaces, PS&E.

Location: Lehi City, Utah