Central Utah Water Conservancy District

ALPINE AQUEDUCT RESILIENCY STUDY
RB&G completed geotechnical borings up to 275 feet deep and assisted the Central Utah Water Conservancy District to assess geotechnical conditions for pipeline realignment evaluations. The tunnel alignment being considered for the project will connect to an existing tunnel and extend in a southerly directions towards 1500 East Street in Orem, Utah.

OLMSTEAD FLOWLINE (WICKS SLIDE)
The Wicks Slide is an active slide that is measured having 0.25 inch of movement per year. The project will consist of geotechnical investigations and inclinometers installed.

SPANISH FORK TO SANTAQUIN PIPELINE
Geotechnical investigations have been completed for three phases of a pipeline installation project in Utah County, Utah. Work performed by RB&G includes completing geotechnical borings, test pits, laboratory testing, and geologic evaluations.

Location: Utah County, Utah